Figure 1

Figure 1

Drill hole SFDH-039 cross-section. SFDH-039 aimed to test the extension of the SFdLA breccia pipe at depth, and more than doubled the depth of the system: the highest-grade intersection (72m @ 5.0 % EqCu or 6.7 g/t EqAu) is located ~250 m below the base of previous drilling on the eastern lobe.

Format

PNG

Source

Turmalina Metals Corp.

Downloads