Table 1: Significant Drill Results at Durusu Target, the Obichnik Gold Project

Table 1

The drill intersections disclosed here have not yet been included in a resource model and true thickness of mineralization has not yet been determined. Drill holes are designed to intersect mineralization perpendicular or close to perpendicular. Drill intersections in this news release are calculated using a top-cut of 20g/t gold, a 0.2g/t gold trigger, a minimum 0.5g/t gold composite, and a maximum of 3 metres consecutive waste.

Format

PNG

Source

Velocity Minerals Ltd.

Downloads