Figure 1

Figure 1

The dataset below was compiled by Soutex and shows the ramp up time for Zgounder’s new plant to reach design capacity, which is the shortest (tied with another project) compared to 100+ other mineral processing plants. Database from Rollins and Lam (2017) [1] in comparison with Soutex’s experience [2].

Format

JPEG

Source

Aya Gold & Silver Inc.

Downloads