Figure 1.

Figure 1.

Schematic integration of IP chargeability and gravity anomalies at Ranoke, shown on a 1VD magnetic base map, with the eleven sites identified for first-pass drilling. The three bold circles are drill hole locations targeted for completion in the first drill program planned for November, 2019. Figure 2 shows the specific anomaly attributes which each drill hole will test for iron oxide copper-gold breccia.

Format

PNG

Source

VR Resources

Downloads