Figure 2: Composite Long Section through the Chibougamau North Camp illustrating Cedar Bay with intersections of 3.4m @ 16.8% CuEq outside of current resources. Refer to ASX releases dated 15 October 2024, 25 March 2025 and 8 May 2025 for previously

Figure 2_Composite Long Section Chibougamau North Camp

Figure 2: Composite Long Section through the Chibougamau North Camp illustrating Cedar Bay with intersections of 3.4m @ 16.8% CuEq outside of current resources. Refer to ASX releases dated 15 October 2024, 25 March 2025 and 8 May 2025 for previously announced drilling results.

Format

JPEG

Source

Cygnus Metals Ltd

Downloads