Figure 2: Composite Long Section through the Chibougamau North Camp illustrating Cedar Bay with intersections of 3.4m @ 16.8% CuEq outside of current resources. Refer to ASX releases dated 15 October 2024, 25 March 2025 and 8 May 2025 for previously
Figure 2: Composite Long Section through the Chibougamau North Camp illustrating Cedar Bay with intersections of 3.4m @ 16.8% CuEq outside of current resources. Refer to ASX releases dated 15 October 2024, 25 March 2025 and 8 May 2025 for previously announced drilling results.
Format
JPEG
Source
Cygnus Metals Ltd