FIGURE 1. Long section highlighting Top Three intercepts announced in 2025 from infill drilling stations in South Austin Zone, including top three highlights from current press release. New South Austin high-grade panel has been outlined in red[1].

figure 1

FIGURE 1. Long section highlighting Top Three intercepts announced in 2025 from infill drilling stations in South Austin Zone, including top three highlights from current press release. New South Austin high-grade panel has been outlined in red[1].[1] Mineral resources are estimated at a cut-off grade of 3.38 g/t Au and a gold price of US1,800/oz. Please refer to the technical report entitled “NI 43-101 Technical Report and Prefeasibility Study for the Madsen Mine, Ontario, Canada”, prepared by SRK Consulting (Canada) Inc. and dated January 7, 2025. A full copy of the SRK report is available on the Company’s website and on SEDAR+ at www.sedarplus.ca.

Format

JPEG

Source

West Red Lake Gold Mines Ltd.

Downloads