Figure 1: Schematic of the two new holes to being drilled and the shaft being cleared.

Figure 1: Schematic of the two new holes to being drilled and the shaft being cleared.

Schematic of the two new holes to being drilled and the shaft being cleared.

Format

JPEG

Source

Ceylon Graphite Corp.

Downloads