Photo 1.

Photo 1.

The truck-mounted RC drill rig set up on drill hole RV21-006 on June 24, 2021. The drill mast is pointing northeasterly to test the roots of the G1 breccia pipe intersected in more than 100 m of drill core in drill hole RV21-005 completed in May and located approximately 150 metres away, up the lower flank of the ridge. Behind the drill in this photo is the Kawich IP anomaly to be drilled later in the program; it is under valley cover and previously unexplored.

Format

JPEG

Source

VR Resources

Downloads