Figure 2

Figure 2

Key critical metal intersections from the first 17 drill holes completed at Hecla-Kilmer, plotted on a contoured RTP magnetic base map with superimposed 3D isoshells from the MVI inversion. The fourth drill program now underway in October, 2022, will focus on two of the three areas with high grade TREO mineralization: 1. Hole 15 area in the northwestern part of the multiphase complex, and; 2. Hole 15 area located some 2.5 km to the south in the south rim of the complex.

Format

JPEG

Source

VR Resources

Downloads