Figure 3

Figure 3

Long section through the East Target at Copeçal showing the planned position of Phase 2 drilling to the east along strike of mineralization intersected in holes COPE-PDH-004 and 009.

Format

PNG

Source

GoldHaven Resources Corp.

Downloads