525688.jpg


Louis Berger as part of a DB-led consortium will provide project management and construction management services, including design review, for the Mumbai Metro Line 4. Line 4 will be a 32.3-kilometer (20-mile) long elevated corridor with 32 stations, connecting Wadala in central Mumbai to Kasarvadavali. Picture Courtesy: Mumbai Metropolitan Region Development Authority.

Format

JPEG

Source

Louis Berger

Downloads