Figure 2

Figure 2

Illustrates the geological interpretation from the Inuk prospect on a 3d magnetics inversion background. Section A-A’ illustrates the position of historical high-grade mineralization in drilling at the interaction of the synclinal fold structure and through-going shear zone. Section B-B’ illustrates mineralization intersected within the fold structure 150 meters to the north of the shear zone. The target zone for a follow-up drill program is highlighted by the black polygon.

Format

JPEG

Source

Auryn Resources Inc.

Downloads