Accessibility: Skip TopNav
Figure 2
Drilling progress as of 14 September 2022 and location relative to USD 1,100 pit shell and current NW pit design and cut-back.
Format
JPEG
Source
Allkem Limited
Downloads
Original
Large
Medium
Small