Figure 1 – Drill hole SFDH-042 and SFDH-043 cross-section.

Figure 1 – Drill hole SFDH-042 and SFDH-043 cross-section.

SFDH-042 and SFDH-043 were designed to test the length of the SFdLA breccia pipe along its long axis, locate mineralisation on the pipes margins, and define the nature of the lower grade breccia core. This drilling indicates the pipe is increasing in size with depth, with shallow mineralisation intersected in SFDH-042 defining a new western extension to mineralisation.

Format

PNG

Source

Turmalina Metals Corp.

Downloads