Figure 1

220405 Fig 1

Romanera deposit initial planned drill pad locations. Drilling platforms have been planned on existing trails and roads, to minimize the environmental footprint of the drill program. Note the surface projection of the Romanera deposit in red. The deposit has only been drilled along 450 meters of the 1,200 meter long TDEM conductor that is associated with the mineralization at the Romanera Deposit.

Format

JPEG

Source

Emerita Resources Corp.

Downloads