Photo 1

Photo1

Photos from recent site visit to the Silverback Project and drill core from April 2024 drilling. Upper: Sample from the surface expression of the nickel-chromium mineralized mafic dyke intersected at the bottom of Hole 2 with visible nickel sulfides. Lower: Sulfides in the fine to medium grained mafic intrusion from 187m in Hole 2. The intrusion is an altered pyroxenite with no visible olivine or other silicate hosts to Ni mineralization.

Format

PNG

Source

VR Resources Ltd.

Downloads