Figure 3: Kharmagtai CuEq grade-tonnage curve for pit-constrained mineralisation on a CuEq cut-off grade basis reported at a 0.55%CuEq Cut-off.

Figure 3: Kharmagtai CuEq grade-tonnage curve for pit-constrained mineralisation on a CuEq cut-off grade basis reported at a 0.55%CuEq Cut-off.

Figure 3: Kharmagtai CuEq grade-tonnage curve for pit-constrained mineralisation on a CuEq cut-off grade basis reported at a 0.55%CuEq Cut-off.

Format

JPEG

Source

Xanadu Mines Ltd.

Downloads