FIGURE 2 Longitudinal Section View of the ACMA and Lewis Deposits at the Donlin Gold Project
Holes designated as being in the Divide area, are on the eastern side of the ACMA pit area, transitioning into the Lewis pit area, as shown in Figure 2. These new and significant high-grade drill hole intercepts point toward the potential feeder zones of this large system. Part of the objective of the 2022 exploration and drill program will be to confirm mineralization continuity and key geologic controls in representative areas of the deposit.
Format
PNG
Source
NOVAGOLD RESOURCES INC.