Accessibility: Skip TopNav
Figure 3:
Long section through the Ming Mine showing the location of drill platforms and drilling as well as the significant DHEM conductor (see ASX announcement dated 7 May 2025). Assay results greater than 0.5% Cu are shown in red.
Format
JPEG
Source
FireFly Metals Limited
Downloads
Original
Large
Medium
Small