Figure 1

Figure 1

Plan map showing the location of diamond drill holes BR-25-560, 574 to 576, 580, 581, 583, 587 to 589, 591 and 604 along with highlights’ assays in the proposed East Pit, Goldboro Gold Deposit

Format

PNG

Source

NexGold Mining Corp.

Downloads