Accessibility: Skip TopNav
Figure 1
Plan map showing the location of diamond drill holes BR-25-560, 574 to 576, 580, 581, 583, 587 to 589, 591 and 604 along with highlights’ assays in the proposed East Pit, Goldboro Gold Deposit
Format
PNG
Source
NexGold Mining Corp.
Downloads
Original
Large
Medium
Small