Figure 1

Figure 1

Drill hole SFDH-044 and SFDH-047 long-section. SFDH-044 and SFDH-047 test the length of the SFdLA breccia pipe along its east-west long axis, in order to better target the contained mineralised bodies. The high-grades in SFDH-047 highlight the high-grade nature of the eastern lobe.

Format

PNG

Source

Turmalina Metals Corp.

Downloads