Figure 4: Cross Section A – A’ – Looking North Through ELD

Figure 4: Cross Section A – A’ – Looking North Through ELD

Drilling along the southern extension of the ELD deposit has returned intersections of similar grades and widths as drill holes completed in 2019. Drilling along the southern portion of ELD is ongoing. Mineralization at ELD remains open at depth.

Format

PNG

Source

Torex Gold Resources Inc.

Downloads