Accessibility: Skip TopNav
Figure 3
John Bull - E-W Drill section (A-A’ on Figure 2) showing 130 m wide mineralisation and internal higher grades. System open below 120 m depth. Note, wider intercepts have no restriction on internal dilution.
Format
JPEG
Source
Novo Resources Corp.
Downloads
Original
Large
Medium
Small