Oblique view of the Valley deposit showing drilling to date, with 2026 drilling highlighted, plotted over faded surface imagery. The shaded area shows the current extent of the Valley pit in three dimensions, as per the 2025 Preliminary Economic Assessment. Drilling in 2026 has encountered an extensive footprint of mineralization at Valley outside of the current MRE.