Accessibility: Skip TopNav
Figure 1:
Outline of the Project (black), proposed survey lines (yellow), and access roads (red polylines). The survey is estimated to comprise 86 line-km with a line spacing of 1,000 m and 250 m station spacing
Format
JPEG
Quelle:
Pan American Energy Corp.
Downloads
Originalgröße
Groß
Mittel
Klein