Comparison of current MRE (Sep 2025) with previous MRE (Mar 2022) for the Chibougamau Copper-Gold Project. Note: The previous MRE is considered a foreign estimate and was not prepared in accordance with the JORC Code. Refer to CY5’s ASX rel

Figure 1. Comparison of Current MRE with Previous MRE

Figure 1: Comparison of current MRE (Sep 2025) with previous MRE (Mar 2022) for the Chibougamau Copper-Gold Project. Note: The previous MRE is considered a foreign estimate and was not prepared in accordance with the JORC Code. Refer to CY5’s ASX release dated 15 October 2024 for further details of the Foreign Estimate.

Format

JPEG

Quelle:

Cygnus Metals Ltd

Downloads