Figure 1:

Figure 1:

Drill team and geologists on site at Lake Giles at the conclusion of the geotechnical drilling programme of works in October 2021 and core trays stacked and ready for transport to laboratory for analysis.

Format

JPEG

Quelle:

Macarthur Minerals Limited

Downloads