Black Pearl Phase I, the first 150 MW of the 300 MW site, is energized and hashing.

Black Pearl Phase I, the first 150 MW of the 300 MW site, is energized and hashing.

Black Pearl Phase I, the first 150 MW of the 300 MW site, is energized and hashing.

Format

JPEG

Quelle:

Cipher Mining Inc.

Downloads