Figure 8

Yellowknife sections Proposed-Fi Main

Cross section through the Fi-Main pegmatite showing multiple closely-spaced dykes, hole YLP-0024 reported from the 2023 program, and one of the planned 2024 drill holes.

Format

JPEG

Quelle:

Li-FT Power Ltd.

Downloads