Accessibility: Skip TopNav
Figure 4
Figure 4. Plan map highlighting the 2022 Xcite TDEM survey completed on the Ascent Project. General drill target areas are circled in red. Anomalous uranium, historical drilling, interpreted faults, and local EM conductors are also displayed.
Format
PNG
Quelle:
Standard Uranium Ltd.
Downloads
Originalgröße
Groß
Mittel
Klein