Figure 2: Composite Long Section through the Chibougamau North Camp illustrating Golden Eye with intersections of up to 5.9m @ 34.1g/t AuEq. Refer to TSXV/ASX releases dated 15 October 2024, 24/25 March 2025 and 7/8 May 2025 for previously announced
Figure 2: Composite Long Section through the Chibougamau North Camp illustrating Golden Eye with intersections of up to 5.9m @ 34.1g/t AuEq. Refer to TSXV/ASX releases dated 15 October 2024, 24/25 March 2025 and 7/8 May 2025 for previously announced drilling results.
Format
JPEG
Quelle:
Cygnus Metals Ltd