Figure 2: Composite Long Section through the Chibougamau North Camp illustrating Golden Eye with intersections of up to 5.9m @ 34.1g/t AuEq. Refer to TSXV/ASX releases dated 15 October 2024, 24/25 March 2025 and 7/8 May 2025 for previously announced

Figure 2. Composite Long Section Chibougamau North Camp

Figure 2: Composite Long Section through the Chibougamau North Camp illustrating Golden Eye with intersections of up to 5.9m @ 34.1g/t AuEq. Refer to TSXV/ASX releases dated 15 October 2024, 24/25 March 2025 and 7/8 May 2025 for previously announced drilling results.

Format

JPEG

Quelle:

Cygnus Metals Ltd

Downloads