Accessibility: Skip TopNav
Figure 3:
Night-time aerial view of the Tucumã Project's process plant, including ball mill, flotation and filtration, taken during the first 24-hour shift of continuous mill operations (July 2024).
Format
JPEG
Quelle:
Ero Copper Corp.
Downloads
Originalgröße
Groß
Mittel
Klein