Figure 2: The Epiroc Jumbo drill brought on site for the Connection Drift project, heading to the portal.
Figure 2: The Epiroc Jumbo drill brought on site for the Connection Drift project, heading to the portal.
Format
PNG
Quelle:
West Red Lake Gold Mines Ltd.