Accessibility: Skip TopNav
Figure 1
RPM Expansion area drill plan map showing Phase 1 drill holes and ongoing Phase 2 drilling. Phase 1 drill holes (red) and Phase 2 proposed/in-progress drill holes (yellow).
Format
JPEG
Quelle:
First Atlantic Nickel Corp.
Downloads
Originalgröße
Groß
Mittel
Klein