Accessibility: Skip TopNav
Figure 2
Reported drill holes from 2023 and planned holes for 2024 winter drilling on the BIG East, Echo, Fi-Main, Fi-SW, Ki, and Shorty pegmatites.
Format
JPEG
Quelle:
Li-FT Power Ltd.
Downloads
Originalgröße
Groß
Mittel
Klein