Figure 3

Image 3

The Choate Road crossing over Bluff Creek was improved to replace a set of culverts with a clear-span bridge. Shown above are the culverts (before) and the new bridge (after). This stream mitigation project was designed to improve fish passage and stream habitat quality. Additional restoration of in-stream features, both up and down-stream from the bridge, will be completed in September 2025.

Format

PNG

Quelle:

Highland Copper Company Inc.

Downloads