Figure 4. One of the six leach tanks at the Madsen Mill, full and operational three days after the mill was restarted.

figure 4

Figure 4. One of the six leach tanks at the Madsen Mill, full and operational three days after the mill was restarted.

Format

JPEG

Quelle:

West Red Lake Gold Mines Ltd.

Downloads