Accessibility: Skip TopNav
Figure 1
Plan map showing the location of diamond drill holes BR-25-560, 574 to 576, 580, 581, 583, 587 to 589, 591 and 604 along with highlights’ assays in the proposed East Pit, Goldboro Gold Deposit
Format
PNG
Quelle:
NexGold Mining Corp.
Downloads
Originalgröße
Groß
Mittel
Klein