Figure 3

Figure 3

John Bull - E-W Drill section (A-A’ on Figure 2) showing 130 m wide mineralisation and internal higher grades. System open below 120 m depth. Note, wider intercepts have no restriction on internal dilution.

Format

JPEG

Quelle:

Novo Resources Corp.

Downloads