Figure 2

231017 VO NR Image 2

Plan map and cross sections along the main zone at Salvador. Assays reported for four of seven UM-bearing holes drilled. Highlights reported here include drill holes DD23MES02, DD23MES03 and DD23MES04, and trenches TR23MES03 and TR23MES04. Assays pending for the remaining holes.

Format

JPEG

Quelle:

ValOre Metals Corporation

Downloads