Accessibility: Skip TopNav
Figure 1
Image of the Big Missouri Ridge showing the location of the drill pad Day-1 in relation to the S1 pit. The location of the cross section in Figure 2 is indicated by the yellow line.
Format
PNG
Quelle:
Ascot Resources Ltd.
Downloads
Originalgröße
Groß
Mittel
Klein