Aya Gold & Silver Drill Results Confirm High-Grade Continuity at Boumadine; New Permits Secured

Surpasses 2026 drilling target of 180,000 metres two months ahead of year-end


MONTREAL, Nov. 04, 2026 (GLOBE NEWSWIRE) -- Aya Gold & Silver Inc. (TSX: AYA; NASDAQ: AYA) (“Aya” or the “Company”) is pleased to announce that it has secured additional permits adjacent to the Boumadine mining license, and to report new high-grade drill results at the Boumadine Project (“Boumadine” or the “Project”) from its ongoing infill drill program in the Kingdom of Morocco. These results confirm strong high-grade continuity along the Boumadine Main Trend and support the potential for continued resource growth and scale.

Highlights

Boumadine Main Trend (5.4km)

  • Multiple additional high-grade intercepts1:
    • BOU-DD26-1076 intercepted 269 grams per tonne (“g/t”) silver equivalent (“AgEq”) over 11.9 metres (“m”) (1.56 g/t gold (“Au”), 28 g/t silver (“Ag”), 3.3% zinc (“Zn”), and 1.3% lead (“Pb”), including 635 g/t AgEq over 2.6m (3.94 g/t Au, 65 g/t Ag, 6.6% Zn, and 2.7% Pb).
    • BOU-DD26-1072 intercepted 239 g/t AgEq over 17.0 m (1.69 g/t Au, 36 g/t Ag, 1.7% Zn, and 0.3% Pb, including 953 g/t AgEq over 1.7m (7.94 g/t Au, 118 g/t Ag, 3.6% Zn, and 0.3% Pb).
    • BOU-DD26-1078 intercepted 331 g/t AgEq over 9.1m (1.96 g/t Au, 31 g/t Ag, 4.5% Zn and 1.5% Pb).
    • BOU-DD26-1071 intercepted 621 g/t AgEq over 3.7m (5.53 g/t Au, 68 g/t Ag, 1.7% Zn and 0.1% Pb), including 862 g/t AgEq over 2.4m (7.98 g/t Au, 72 g/t Ag, 2.5% Zn, and 0.1% Pb).
    • BOU-DD26-1034 intercepted 442 g/t AgEq over 4.7m (3.2 g/t Au, 77 g/t Ag, 2.9% Zn, and 0.4% Pb) including 645 g/t AgEq over 2.6m (4.61 g/t Au, 108g/t Ag, 4.8% Zn and 0.5% Pb).
  • Exploration Update:
    • 181,685 m of drilling completed at Boumadine year-to-date, ahead of schedule.
    • Achieved 51% of the 2-year infill program of 360,000 m, to be carried out over 2026 and 2027.
    • Secured three additional exploration permits that fill gaps surrounding the Boumadine mining license. The new area of the Project is now 357 km2.

“These drill results confirm the continuity, width and grade of the Boumadine Main Trend, and every round of drilling reinforces the scale of this system,” said Benoit La Salle, President & CEO. “With two months still left in the year, we have already completed our 2026 infill drilling objective, with more than 181,000 m drilled and 16 rigs turning. At the same time, three newly granted exploration permits close the gaps around the mining license and expand the Project area to 357 km². We are aggressively advancing the 2026–2027 program ahead of the feasibility study next year.”

Table 1 – Significant Intercepts from Boumadine Drill Exploration Program (Core Lengths)

DDH No.
FromToAuAgLength1CuPbZnMoAg Eq2
(m)(m)(g/t)(g/t)(m)(%)(%)(%)(g/t)(g/t)
BOU-DD26-1033 16.0  21.0  0.03  127  5.0  0.0  0.0  0.0  1  131 
BOU-DD26-1033 173.6  177.2  1.23  34  3.6  0.1  0.4  1.8  43  197 
BOU-DD26-1034 229.2  233.9  3.20  77  4.7  0.1  0.4  2.9  74  442 
Including 230.4  233.0  4.61  108  2.6  0.2  0.5  4.8  63  645 
BOU-DD26-1035 293.2  301.4  0.47  23  8.2  0.1  1.0  2.1  4  134 
BOU-DD26-1036 332.9  336.7  2.12  16  3.8  0.0  0.1  0.0  3  211 
BOU-DD26-1038 291.8  298.5  2.25  19  6.7  0.0  0.2  0.8  4  245 
Including 291.8  294.2  4.71  27  2.4  0.0  0.1  0.7  2  468 
BOU-DD26-1040 112.0  118.0  1.08  19  6.0  0.0  0.2  1.7  7  157 
BOU-DD26-1041 169.6  174.2  0.81  28  4.6  0.2  0.2  1.1  10  144 
BOU-DD26-1042 435.3  439.2  1.83  19  3.9  0.0  0.0  0.1  4  187 
BOU-DD26-1043 205.0  210.6  1.70  25  5.6  0.0  0.5  2.5  7  239 
Including 206.3  208.4  3.14  43  2.1  0.1  0.9  4.0  10  429 
BOU-DD26-1049 224.7  227.6  1.50  21  2.9  0.0  2.1  0.6  15  209 
BOU-DD26-1049 224.7  235.2  0.95  17  10.5  0.0  1.2  1.0  9  148 
BOU-DD26-1052 262.8  268.5  1.99  21  5.7  0.0  0.3  0.4  5  216 
Including 264.9  267.0  3.80  31  2.1  0.1  0.3  0.3  6  388 
BOU-DD26-1053 34.4  38.9  0.84  113  4.5  0.0  1.4  2.6  6  269 
BOU-DD26-1055 299.0  301.2  4.39  37  2.2  0.1  0.2  0.3  6  450 
BOU-DD26-1057 131.0  144.2  0.79  10  13.2  0.0  0.0  0.2  2  87 
BOU-DD26-1060 500.5  503.3  2.25  29  2.8  0.0  0.2  5.0  1  342 
BOU-DD26-1061 175.0  178.8  1.55  23  3.8  0.0  0.1  0.4  5  174 
BOU-DD26-1065 267.1  269.9  2.69  30  2.8  0.2  0.1  0.1  3  290 
BOU-DD26-1065 282.1  290.4  1.83  32  8.3  0.1  0.1  0.1  3  205 
Including 284.0  286.7  3.31  71  2.7  0.1  0.1  0.1  3  382 
BOU-DD26-1069 53.6  55.0  1.79  69  1.4  0.0  4.2  7.2  31  458 
BOU-DD26-1071 362.4  366.1  5.53  68  3.7  0.3  0.1  1.7  2  621 
Including 362.4  364.8  7.98  72  2.4  0.3  0.1  2.5  1  862 
BOU-DD26-1072 94.6  111.6  1.69  36  17.0  0.1  0.3  1.7  12  239 
Including 104.5  106.2  7.94  118  1.7  0.6  0.3  3.6  12  953 
BOU-DD26-1074 52.0  59.3  0.64  28  7.3  0.0  1.8  2.7  21  176 
BOU-DD26-1076 146.5  158.4  1.56  28  11.9  0.1  1.3  3.3  15  269 
Including 147.1  149.7  3.94  65  2.6  0.4  2.7  6.6  19  635 
BOU-DD26-1077 54.9  59.1  1.10  26  4.2  0.0  0.3  0.7  44  145 
BOU-DD26-1078 154.9  164.0  1.96  31  9.1  0.1  1.5  4.5  33  331 
BOU-DD26-1078 174.2  177.2  1.85  22  3.0  0.1  0.2  1.4  10  225 
  1. True width remains undetermined at this stage; all values are uncut.
  2. Ag equivalent is based on a silver price of US$30/oz with a process recovery of 96%, a gold price of US$2,800/oz with a process recovery of 96%, a zinc price of US$1.20/lb with a process recovery of 75%, a lead price of US$1.00/lb with a process recovery of 82%, and a copper price of US$4.60/lb with a process recovery of 75% resulting in the following ratios: 1g/t Au: 89.7g/t Ag; 1% Cu: 78.6 g/t Ag; 1% Pb: 18.7 g/t Ag; and 1% Zn: 20.4 g/t Ag

Figure 1: Boumadine Mining Licence Surface Plan with Magnetic Data (Residual Total Field) and 2026 Drill Holes
Figure 1: Boumadine Mining Licence Surface Plan with Magnetic Data (Residual Total Field) and 2026 Drill Holes

2026 Exploration Results

This year, 524 diamond drill holes (“DDH”), and 15 reverse circulation drill holes (“RC”) totaling 181,685m have been completed at Boumadine (Figure 1 and Appendix 2). Drilling was executed on strike along the Main Trend, Tizi and Imariren. All results have been received for drill holes up to BOU-DD26-1080 (Table 1, Figure 3, Figure 4 and Appendix 1).

Today’s results, including BOU-DD26-1072 and BOU-DD26-1076, confirm the high-grade nature and continuity of the Boumadine Main Trend, which remains open in all directions.

With the addition of 3 new exploration permits, Boumadine now covers 357 km2 of highly prospective ground (Figure 2). These new permits secure a gap that was left around Boumadine mining license.

Mineralization within the Boumadine Main Trend measures up to 4m wide (locally reaching over a 10m width) and is N340-oriented massive sulphide lenses/veins sharply dipping eastward (> 70°). The massive sulphide veins (>80%) are mainly composed of pyrite, with variable proportions of sphalerite, galena, and chalcopyrite. Tizi and Imariren share the same characteristics except for their N000 orientation.

Figure 2 – Location of New Permits at Boumadine
Figure 2 – Location of New Permits at Boumadine

Figure 3 – Surface Plan of Boumadine North Zone with New DDH Results
Figure 3 – Surface Plan of Boumadine North Zone with New DDH Results

Figure 4 – Surface Plan of Boumadine South Zone with New DDH Results
Figure 4 – Surface Plan of Boumadine South Zone with New DDH Results

Next Steps

Our 2026 exploration objectives included 180,000 m of infill drilling (half of the two-year, 360,000 m program), as well as 20,000 m of regional drilling targeting prospective areas, including follow-up work on the Asirem structures.

Significant potential exists to expand the Boumadine Main Trend (currently 5.4 km), the Tizi Zone (2.0 km) and the Imariren Zone (1.2 km), with all three trends open in all directions. Follow-up drilling is also planned on the 8 km Asirem trend for later this year.

Most drilling will continue to focus on the Main Trend, Imariren and Tizi to extend known mineralization along strike and at depth, while infilling key areas to advance the Project toward a feasibility study. For the remainder of 2026, the Company will prioritize infill drilling to accelerate feasibility study work. In 2027, infill drilling will continue to be prioritized to support the feasibility study. Once completed, drilling efforts will include follow-up work at Asirem and greenfield exploration, testing geological hypotheses and targets generated over the past four years. Ongoing geological work will guide additional development priorities.

Technical Information

Aya has implemented a quality control program to comply with best practices in sampling and analysis of drill core and RC chips. For core drilling, all individual samples represent approximately one metre in length of core, which is halved. Half of the core is kept on site for reference, and its counterpart is sent for preparation and assaying to African Laboratory for Mining and Environment (“Afrilab”) in Marrakech, Morocco. For drilling using RC, all individual samples represent 1.0m in length and a representative portion is kept for every metre in some chip trays stored on site. A split samples representing 1/16th, ranging from 2 to 4 kilogram is sent for preparation and assaying to African Laboratory for Mining and Environment (“Afrilab”) in Marrakech, Morocco.

All samples are analyzed for silver, copper, iron, lead, zinc, tin, and molybdenum using Aqua regia and finished by atomic absorption spectroscopy (“AAS”). Samples grading above 200 g/t Ag are reanalyzed using fire assaying. Gold is assayed by fire assaying. Standards of different grades and blanks were inserted every 20 samples in addition to the standards, blanks and pulp duplicate inserted by Afrilab.

Qualified Person

The scientific and technical information contained in this press release have been reviewed by David Lalonde, B. Sc, P. Geo, Executive Vice-President Exploration, Qualified Person, for accuracy and compliance with National Instrument 43-101.

About Aya Gold & Silver Inc.

Aya Gold & Silver is a Canadian precious metals mining company anchored in Morocco and active across the full mining value chain. The Company has established an exploration track record through a systematic, technology-led, data-driven approach and is focused on expanding its resource base and land package along the Anti-Atlas fault — one of Africa’s most geologically rich, underexplored and mining-friendly regions.

Aya operates Zgounder, a rare, silver-only mine, producing silver doré from its new processing facility. Aya’s growth pipeline includes the Boumadine polymetallic project, where feasibility study work is underway, and which hosts a sizable mineralized footprint, and potential for further discovery.

Led by a proven team of mining professionals, Aya is guided by a vision of responsible mining and is committed to delivering sustainable value for shareholders, employees and host communities.

For additional information, please visit Aya’s website at www.ayagoldsilver.com.

Or contact

Benoit La Salle, FCPA, MBA
President & CEO
Benoit.lasalle@ayagoldsilver.com
Alex Ball
EVP, Capital Markets
alex.ball@ayagoldsilver.com
  

Forward-Looking Statements

This press release contains “forward-looking statements” or “forward-looking information” within the meaning of applicable securities laws and other statements that are not historical facts. Forward-looking statements are included to provide information about management’s current expectations, estimates and projections regarding the Company's future growth and business prospects (including the timing and development of deposits and the success of exploration activities) and other opportunities as of the date of this press release. All statements, other than statements of historical fact included in this press release, regarding the Company’s strategy, future operations, technical assessments, prospects, plans and objectives of management are forward-looking statements that involve risks and uncertainties. Wherever possible, words such as “aim”, “anticipate”, “assume”, “believe”, “estimate”, “expect”, “goal”, “intend”, “objective”, “plan”, “potential”, “strategy”, “target”, and similar expressions or statements that certain actions, events or results “may”, “could”, “would”, “might”, “will”, or are “likely” to be taken, occur or be achieved, have been used to identify such forward-looking information. Specific forward looking statements in this press release include, but are not limited to, statements and information with respect to the exploration and resource potential of the Boumadine project, including of the Boumadine Main Trend, Imariren and Tizi; the Company’s future drilling program, including as discussed under the section "Next Steps"; the expected scope, pace, placement, focus, and completion timing of drilling activities; the anticipated completion of a feasibility study for the Project in 2027; the expected impact of geological interpretations on mine planning, resource modelling, and operational priorities; and other assumptions and factors generally associated with the mining industry.

Forward-looking information is based upon certain assumptions and other important factors that, if untrue, could cause the actual results, performance or achievements of the Company to be materially different from future results, performance or achievements expressed or implied by such information or statements. There can be no assurance that such information or statements will prove to be accurate. Key assumptions upon which the Company’s forward looking information is based include without limitation, the Company’s ability to timely receive any requisite approvals, permits or licences; the feasibility study as and when anticipated; the Company’s ability to import goods and machinery; the Company’s ability to engage and retain all necessary personnel in order to operate its business properly and without interruption; the accuracy and reliability of estimates, projections, forecasts, studies and assessments, including the mineral reserve and mineral resource estimates (including, but not limited to, ore tonnage and ore grade estimates); the Company’s ability to meet or achieve estimates, projections and forecasts; assumptions regarding development and exploration activities; the timing, extent, duration and economic viability of such explorations activities; process recovery; the price of commodities, including silver and gold; exchange rates; taxation levels; fuel and energy costs; future economic conditions; the Company’s ability to meet current and future obligations; the Company’s ability to obtain timely financing on reasonable terms when required; the current and future social, economic and political conditions and environment in which the Company operates; and other assumptions and factors generally associated with the mining industry.

Readers are cautioned that the foregoing list is not exhaustive of all factors and assumptions which may have been used. Forward-looking statements are also subject to risks and uncertainties facing the Company’s business, any of which could have a material adverse effect on the Company’s business, financial condition, results of operations and growth prospects. Some of the risks the Company faces and the uncertainties that could cause actual results to differ materially from those expressed in the forward-looking statements include, among others: the inherent risks involved in exploration and development of mineral properties, including risks and hazards associated with the business of mineral exploration, development, and mining, including environmental hazards, potential unintended releases of contaminants, industrial accidents, unusual or unexpected geological or structural formations, pressures, cave-ins, and flooding; risks related to Aya’s operations in Morocco; the speculative nature of mineral exploration and development; inadequate or unreliable infrastructure (such as roads, bridges, power sources and water supplies); fluctuations in forward markets for silver and other commodities (such as natural gas, fuel, oil and electricity); availability of gas, fuel, and oil; restrictions on mining in the jurisdictions in which Aya operates; change in laws and regulations governing our operations, exploration, and development activities, including international laws and legal norms, such as those relating to Indigenous peoples and human rights; expectations with respect to any future pandemics on our operations, and assumptions related thereto; Aya’s ability to attract and retain qualified employees and contractors; Aya’s ability to obtain and renew necessary permits and licenses; Aya’s ability to obtain and maintain insurance; third party risks; disruptions to Aya’s business operations; Aya’s reliance on technology and information systems; interest and exchange rates risks; tax risks; unforeseen expenses; public health crises; climate change; weather disruptions; general economic conditions; commodity prices; gold and silver demand; force majeure; the inherent risks involved in exploration and development of mineral properties; and other risks described in the Company’s documents filed with Canadian and U.S. securities regulatory authorities.

In addition, readers are directed to carefully review the detailed risk discussion in the Company’s Annual Information Form and Management’s Discussion & Analysis for the year ended December 31, 2025, filed on SEDAR+ and on EDGAR, which discussions are incorporated by reference in this press release, for a fuller understanding of the risks and uncertainties that affect the Company’s business and operations.

Although the Company believes its expectations are based upon reasonable assumptions and has attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in forward-looking statements, there may be other factors that cause actions, events or results not to be as anticipated, estimated or intended. There can be no assurance that forward-looking information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such information. As such, these risks are not exhaustive; however, they should be considered carefully. If any of these risks or uncertainties materialize, actual results may vary materially from those anticipated in the forward-looking statements found herein. Due to the risks, uncertainties, and assumptions inherent in forward-looking statements, readers should not place undue reliance on forward-looking statements.

Forward-looking statements contained herein are presented for the purpose of assisting investors in understanding the Company’s business plans, financial performance and condition and may not be appropriate for other purposes.

The forward-looking statements contained herein are made only as of the date hereof. The Company disclaims any intention or obligation to update or revise any forward-looking statements, whether as a result of new information, future events or otherwise, except to the extent required by applicable law. The Company qualifies all of its forward-looking statements by these cautionary statements.

Appendix 1 - Full Drill Results from Boumadine (core lengths)

DDH No.
FromToAuAgLength1CuPbZnMoAg Eq2
(m)(m)(g/t)(g/t)(m)(%)(%)(%)(g/t)(g/t)
BOU-DD26-1029 58.0  59.0  0.61  0  1.0  0.0  0.0  0.0  5  56 
BOU-DD26-1029 165.0  166.0  2.27  3  1.0  0.0  0.1  0.0  5  208 
BOU-DD26-1030 0.0  404.0  0.00  0  404.0  0.0  0.0  0.0  0 NSR
BOU-DD26-1031 89.0  89.8  0.03  187  0.8  0.1  3.5  1.3  11  289 
BOU-DD26-1031 144.0  145.0  0.03  250  1.0  0.0  0.1  0.1  4  257 
BOU-DD26-1031 163.0  164.0  0.03  100  1.0  0.0  0.0  0.0  1  104 
BOU-DD26-1031 168.0  169.0  0.03  142  1.0  0.0  0.0  0.0  0  145 
BOU-DD26-1032 91.5  94.0  1.82  25  2.5  0.1  0.1  0.5  18  210 
BOU-DD26-1033 16.0  21.0  0.03  127  5.0  0.0  0.0  0.0  1  131 
BOU-DD26-1033 133.7  134.2  1.22  24  0.5  0.0  0.1  0.1  1  138 
BOU-DD26-1033 136.3  142.2  0.69  12  5.9  0.0  0.0  0.1  0  79 
Including 136.3  137.7  1.24  12  1.4  0.0  0.1  0.1  0  127 
BOU-DD26-1033 173.6  177.2  1.23  34  3.6  0.1  0.4  1.8  43  197 
BOU-DD26-1034 217.9  218.4  0.35  22  0.5  0.1  0.9  2.0  7  120 
BOU-DD26-1034 229.2  233.9  3.20  77  4.7  0.1  0.4  2.9  74  442 
Including 230.4  233.0  4.61  108  2.6  0.2  0.5  4.8  63  645 
BOU-DD26-1035 31.8  32.8  0.78  15  1.0  0.0  0.1  0.2  5  93 
BOU-DD26-1035 36.1  37.0  0.68  18  0.9  0.0  1.2  0.8  5  118 
BOU-DD26-1035 225.0  226.0  0.40  31  1.0  0.0  0.2  0.1  8  72 
BOU-DD26-1035 268.0  269.0  0.57  12  1.0  0.0  0.2  0.4  7  78 
BOU-DD26-1035 273.0  274.0  0.15  37  1.0  0.1  2.1  2.6  3  146 
BOU-DD26-1035 273.0  275.0  0.43  35  2.0  0.1  1.9  2.5  5  164 
BOU-DD26-1035 273.0  276.0  0.43  36  3.0  0.1  2.0  2.8  4  176 
BOU-DD26-1035 278.0  279.0  0.33  31  1.0  0.1  1.5  6.7  6  234 
BOU-DD26-1035 287.0  288.0  0.07  89  1.0  0.0  0.4  1.0  4  126 
BOU-DD26-1035 293.2  301.4  0.47  23  8.2  0.1  1.0  2.1  4  134 
BOU-DD26-1036 71.6  72.2  1.53  19  0.6  0.0  0.6  1.8  4  205 
BOU-DD26-1036 332.9  336.7  2.12  16  3.8  0.0  0.1  0.0  3  211 
BOU-DD26-1037 135.0  136.0  0.12  42  1.0  0.3  2.8  0.9  156  151 
BOU-DD26-1037 178.5  179.0  0.66  72  0.5  0.3  0.3  0.6  17  176 
BOU-DD26-1037 184.6  185.4  0.06  246  0.8  0.1  0.0  0.0  0  256 
BOU-DD26-1037 218.9  219.5  0.69  23  0.6  0.1  0.9  2.8  7  163 
BOU-DD26-1037 260.0  260.9  0.84  6  0.9  0.0  0.1  0.2  4  88 
BOU-DD26-1038 3.6  4.5  0.03  57  0.9  0.0  0.0  0.1  1  63 
BOU-DD26-1038 186.3  186.8  0.63  17  0.5  0.0  0.1  0.0  5  78 
BOU-DD26-1038 256.2  260.3  0.59  6  4.1  0.0  0.0  0.2  5  64 
BOU-DD26-1038 274.5  276.2  0.90  6  1.7  0.0  0.1  0.3  3  95 
BOU-DD26-1038 283.4  284.3  0.48  12  0.9  0.0  0.5  0.9  5  84 
BOU-DD26-1038 291.8  298.5  2.25  19  6.7  0.0  0.2  0.8  4  245 
Including 291.8  294.2  4.71  27  2.4  0.0  0.1  0.7  2  468 
BOU-DD26-1039 30.4  31.4  0.62  19  1.0  0.0  1.6  2.4  7  154 
BOU-DD26-1039 91.9  92.9  2.12  25  1.0  0.0  0.4  0.3  8  231 
BOU-DD26-1040 25.0  26.0  0.12  55  1.0  0.0  1.1  2.2  6  130 
BOU-DD26-1040 28.0  28.9  0.19  36  0.9  0.0  1.1  2.7  5  130 
BOU-DD26-1040 112.0  118.0  1.08  19  6.0  0.0  0.2  1.7  7  157 
Including 114.9  117.0  2.11  25  2.1  0.0  0.1  0.5  8  230 
BOU-DD26-1041 169.6  174.2  0.81  28  4.6  0.2  0.2  1.1  10  144 
BOU-DD26-1042 94.0  95.0  0.03  87  1.0  0.0  0.2  0.2  5  96 
BOU-DD26-1042 420.8  421.6  4.68  51  0.8  0.2  0.8  0.5  4  510 
BOU-DD26-1042 432.4  432.9  2.44  23  0.5  0.2  0.1  0.2  5  262 
BOU-DD26-1042 435.3  439.2  1.83  19  3.9  0.0  0.0  0.1  4  187 
Including 435.3  436.7  3.75  35  1.4  0.0  0.0  0.0  5  374 
BOU-DD26-1043 205.0  210.6  1.70  25  5.6  0.0  0.5  2.5  7  239 
Including 206.3  208.4  3.14  43  2.1  0.1  0.9  4.0  10  429 
BOU-DD26-1044 242.6  243.5  0.70  10  0.9  0.1  0.0  0.1  6  83 
BOU-DD26-1044 268.2  269.3  3.01  30  1.1  0.1  0.1  0.9  7  326 
BOU-DD26-1044 312.8  314.7  1.02  5  1.9  0.0  0.0  0.0  4  99 
BOU-DD26-1044 317.8  318.7  0.61  0  0.9  0.0  0.0  0.1  4  58 
BOU-DD26-1044 337.4  338.9  0.82  14  1.5  0.0  0.9  1.1  10  129 
BOU-DD26-1045 319.1  320.1  0.03  56  1.0  0.0  0.0  0.0  5  59 
BOU-DD26-1046 0.0  333.0  0.00  0  333.0  0.0  0.0  0.0  0 NSR
BOU-DD26-1047 54.6  55.1  1.04  244  0.5  2.7  19.5  3.1  5  974 
BOU-DD26-1047 66.8  67.6  0.39  17  0.8  0.0  0.7  1.2  3  91 
BOU-DD26-1048 0.0  375.0  0.00  0  375.0  0.0  0.0  0.0  0 NSR
BOU-DD26-1049 224.7  227.6  1.50  21  2.9  0.0  2.1  0.6  15  209 
BOU-DD26-1049 224.7  235.2  0.95  17  10.5  0.0  1.2  1.0  9  148 
BOU-DD26-1049 268.3  269.2  0.44  11  0.9  0.0  0.8  0.1  20  70 
BOU-DD26-1049 318.3  320.6  0.18  112  2.3  0.0  1.4  0.1  1  158 
BOU-DD26-1050 0.0  397.3  0.00  0  397.3  0.0  0.0  0.0  0 NSR
BOU-DD26-1051 99.5  101.4  0.47  25  1.9  0.0  0.8  5.1  5  188 
BOU-DD26-1051 103.4  104.4  0.70  11  1.0  0.0  0.3  1.4  3  109 
BOU-DD26-1051 107.4  108.4  0.61  9  1.0  0.0  0.5  1.2  2  98 
BOU-DD26-1051 112.2  113.2  0.03  70  1.0  0.0  0.0  0.1  1  74 
BOU-DD26-1052 262.8  268.5  1.99  21  5.7  0.0  0.3  0.4  5  216 
Including 264.9  267.0  3.80  31  2.1  0.1  0.3  0.3  6  388 
BOU-DD26-1052 281.0  282.0  0.06  47  1.0  0.0  0.3  0.2  6  64 
BOU-DD26-1052 356.7  357.6  0.50  9  0.9  0.0  0.3  1.5  0  92 
BOU-DD26-1052 453.2  453.7  0.91  27  0.5  0.0  0.3  0.2  12  118 
BOU-DD26-1052 458.0  458.6  0.79  11  0.6  0.0  0.1  0.1  3  86 
BOU-DD26-1052 459.8  460.8  0.86  20  1.0  0.0  0.2  0.3  6  109 
BOU-DD26-1053 29.8  30.8  0.08  89  1.0  0.0  0.3  0.7  5  118 
BOU-DD26-1053 34.4  38.9  0.84  113  4.5  0.0  1.4  2.6  6  269 
BOU-DD26-1053 299.0  299.5  1.29  23  0.5  0.1  0.2  0.4  1  155 
BOU-DD26-1053 315.5  316.7  1.72  19  1.2  0.0  0.2  1.4  3  207 
BOU-DD26-1053 329.3  330.0  3.99  29  0.7  0.0  0.0  0.1  0  391 
BOU-DD26-1053 395.5  396.4  0.28  26  0.9  0.0  1.3  1.6  75  113 
BOU-DD26-1053 397.5  398.0  1.20  29  0.5  0.1  0.9  2.1  169  204 
BOU-DD26-1053 402.2  405.0  1.06  19  2.8  0.0  0.0  0.2  0  122 
BOU-DD26-1053 454.0  455.0  0.84  6  1.0  0.0  0.2  0.5  0  96 
BOU-DD26-1054 6.8  7.8  0.61  9  1.0  0.0  0.6  0.0  9  79 
BOU-DD26-1054 53.0  54.0  0.29  27  1.0  0.0  1.2  1.7  9  112 
BOU-DD26-1054 142.7  143.5  0.52  24  0.8  0.0  2.4  1.7  0  153 
BOU-DD26-1054 152.4  153.0  0.41  21  0.6  0.0  0.4  0.4  0  75 
BOU-DD26-1055 40.6  42.6  1.06  2  2.0  0.0  0.0  0.0  2  97 
BOU-DD26-1055 44.6  45.6  0.56  5  1.0  0.0  0.0  0.1  6  57 
BOU-DD26-1055 299.0  301.2  4.39  37  2.2  0.1  0.2  0.3  6  450 
BOU-DD26-1055 400.0  401.0  0.13  61  1.0  0.1  0.1  0.0  10  85 
BOU-DD26-1055 482.7  483.6  0.61  0  0.9  0.0  0.0  0.0  1  56 
BOU-DD26-1055 485.4  486.0  0.93  22  0.6  0.0  0.2  0.1  1  114 
BOU-DD26-1055 493.0  494.0  0.64  1  1.0  0.0  0.0  0.0  12  60 
BOU-DD26-1055 505.2  505.8  0.42  18  0.6  0.1  1.4  2.1  5  128 
BOU-DD26-1055 506.8  507.7  0.89  9  0.9  0.0  0.4  0.3  6  105 
BOU-DD26-1056 61.7  62.6  3.83  177  0.9  0.2  0.3  1.4  4  569 
BOU-DD26-1056 74.0  75.0  0.47  12  1.0  0.0  0.9  1.1  1  93 
BOU-DD26-1056 202.3  203.2  0.56  9  0.9  0.0  0.6  0.6  2  83 
BOU-DD26-1057 120.0  122.0  1.01  14  2.0  0.0  0.1  0.3  2  113 
BOU-DD26-1057 131.0  144.2  0.79  10  13.2  0.0  0.0  0.2  2  87 
Including 136.2  138.2  1.63  32  2.0  0.0  0.1  0.5  1  192 
BOU-DD26-1058 303.0  304.0  0.03  58  1.0  0.0  0.0  0.0  0  61 
BOU-DD26-1058 330.9  332.3  1.79  18  1.4  0.0  0.4  1.6  4  221 
BOU-DD26-1059 196.0  201.0  0.61  0  5.0  0.0  0.0  0.0  4  57 
BOU-DD26-1059 204.0  205.0  0.59  0  1.0  0.0  0.0  0.0  0  55 
BOU-DD26-1060 172.2  173.1  1.18  2  0.9  0.0  0.0  0.2  1  113 
BOU-DD26-1060 365.2  368.2  0.62  34  3.0  0.1  0.4  2.3  2  148 
Including 365.2  365.7  1.14  49  0.5  0.1  0.7  4.2  3  259 
BOU-DD26-1060 484.4  485.0  0.25  32  0.6  0.1  7.2  0.4  0  203 
BOU-DD26-1060 498.6  499.2  0.53  19  0.6  0.0  0.2  0.6  3  84 
BOU-DD26-1060 500.5  503.3  2.25  29  2.8  0.0  0.2  5.0  1  342 
BOU-DD26-1061 19.0  22.0  0.06  99  3.0  0.5  0.0  0.1  1  143 
BOU-DD26-1061 24.0  25.9  0.08  83  1.9  0.3  0.2  0.1  3  121 
BOU-DD26-1061 143.5  144.0  0.32  51  0.5  0.1  1.8  6.8  2  258 
BOU-DD26-1061 171.1  173.0  0.46  21  1.9  0.0  0.2  0.4  3  78 
BOU-DD26-1061 175.0  178.8  1.55  23  3.8  0.0  0.1  0.4  5  174 
BOU-DD26-1061 258.3  259.3  0.62  13  1.0  0.0  0.8  0.8  0  100 
BOU-DD26-1063 94.8  95.5  0.48  85  0.7  0.0  3.7  2.2  8  244 
BOU-DD26-1063 356.8  357.4  0.76  10  0.6  0.0  0.1  0.4  3  91 
BOU-DD26-1063 360.7  361.8  2.68  45  1.1  0.0  0.1  2.5  3  340 
BOU-DD26-1063 362.8  363.8  0.60  20  1.0  0.0  0.1  0.2  3  80 
BOU-DD26-1063 366.8  367.8  2.54  5  1.0  0.0  0.0  0.0  4  236 
BOU-DD26-1063 377.3  377.8  0.86  23  0.5  0.0  0.8  0.4  4  125 
BOU-DD26-1064 198.5  200.7  1.68  22  2.2  0.0  0.1  0.1  13  176 
BOU-DD26-1064 213.4  214.2  0.06  77  0.8  0.7  0.3  0.1  4  143 
BOU-DD26-1064 250.0  251.0  0.08  48  1.0  0.3  0.1  0.1  2  81 
BOU-DD26-1064 257.0  258.7  0.67  43  1.7  0.1  0.3  0.3  3  126 
BOU-DD26-1064 293.0  294.0  4.44  2  1.0  0.0  0.2  0.2  2  409 
BOU-DD26-1064 377.7  378.6  0.44  34  0.9  0.0  1.1  1.8  0  133 
BOU-DD26-1064 381.4  382.4  0.38  31  1.0  0.0  0.3  0.6  3  83 
BOU-DD26-1065 72.0  72.6  0.64  11  0.6  0.0  0.5  1.1  1  100 
BOU-DD26-1065 246.0  249.7  1.43  15  3.7  0.0  0.1  0.6  6  161 
BOU-DD26-1065 254.7  255.3  0.61  11  0.6  0.0  0.0  0.1  4  69 
BOU-DD26-1065 258.4  259.8  0.81  21  1.4  0.0  0.0  0.0  3  98 
BOU-DD26-1065 267.1  269.9  2.69  30  2.8  0.2  0.1  0.1  3  290 
Including 267.1  268.1  4.66  39  1.0  0.5  0.0  0.1  3  495 
BOU-DD26-1065 282.1  290.4  1.83  32  8.3  0.1  0.1  0.1  3  205 
Including 284.0  286.7  3.31  71  2.7  0.1  0.1  0.1  3  382 
BOU-DD26-1065 293.3  294.0  1.47  30  0.7  0.1  0.1  0.6  3  186 
BOU-DD26-1065 314.6  315.5  3.84  13  0.9  0.0  0.1  0.1  5  362 
BOU-DD26-1066 58.6  59.3  1.02  24  0.7  0.0  0.0  0.0  12  117 
BOU-DD26-1066 62.5  63.1  0.72  17  0.6  0.1  0.1  0.0  9  94 
BOU-DD26-1066 72.5  73.5  0.97  9  1.0  0.0  0.0  0.0  6  97 
BOU-DD26-1066 75.0  76.0  0.81  3  1.0  0.0  0.1  0.0  3  78 
BOU-DD26-1066 406.3  407.1  1.54  19  0.8  0.1  0.5  1.9  7  212 
BOU-DD26-1067 0.0  404.0  0.00  0  404.0  0.0  0.0  0.0  0 NSR
BOU-DD26-1068 63.0  64.0  0.62  6  1.0  0.0  0.0  0.1  6  67 
BOU-DD26-1068 450.0  451.0  0.92  9  1.0  0.0  0.1  0.2  15  98 
BOU-DD26-1069 39.9  42.2  0.65  33  2.3  0.0  1.2  1.8  22  152 
BOU-DD26-1069 53.6  55.0  1.79  69  1.4  0.0  4.2  7.2  31  458 
BOU-DD26-1069 62.6  63.5  0.14  41  0.9  0.0  0.1  0.5  10  67 
BOU-DD26-1069 65.3  65.8  1.51  54  0.5  0.1  2.6  3.2  14  312 
BOU-DD26-1070 505.0  506.0  0.65  7  1.0  0.0  0.0  0.1  3  68 
BOU-DD26-1071 116.3  117.0  1.22  15  0.7  0.0  0.6  1.4  3  165 
BOU-DD26-1071 303.0  306.8  0.82  11  3.8  0.0  0.3  0.7  5  108 
BOU-DD26-1071 313.7  315.4  0.67  9  1.7  0.0  0.2  0.4  2  82 
BOU-DD26-1071 332.0  333.0  0.62  7  1.0  0.0  0.0  0.1  2  66 
BOU-DD26-1071 336.7  337.4  1.12  19  0.7  0.0  0.0  0.0  3  123 
BOU-DD26-1071 362.4  366.1  5.53  68  3.7  0.3  0.1  1.7  2  621 
Including 362.4  364.8  7.98  72  2.4  0.3  0.1  2.5  1  862 
BOU-DD26-1071 367.3  367.8  0.92  11  0.5  0.1  0.0  2.1  4  147 
BOU-DD26-1072 70.0  71.0  0.47  19  1.0  0.0  0.8  1.5  3  110 
BOU-DD26-1072 81.0  82.0  0.47  16  1.0  0.0  0.8  1.5  8  105 
BOU-DD26-1072 94.6  111.6  1.69  36  17.0  0.1  0.3  1.7  12  239 
Including 104.5  106.2  7.94  118  1.7  0.6  0.3  3.6  12  953 
BOU-DD26-1072 113.2  114.0  0.70  15  0.8  0.0  0.2  0.7  9  96 
BOU-DD26-1072 118.9  119.4  0.27  51  0.5  0.0  0.9  3.3  65  160 
BOU-DD26-1072 133.0  134.0  0.03  58  1.0  0.0  0.2  0.1  4  66 
BOU-DD26-1072 147.0  148.0  0.56  6  1.0  0.0  0.2  0.0  19  62 
BOU-DD26-1073 30.7  31.3  1.09  11  0.6  0.0  0.2  0.1  4  115 
BOU-DD26-1073 32.7  34.7  2.15  28  2.0  0.0  0.1  0.1  5  228 
BOU-DD26-1073 46.0  47.0  0.03  64  1.0  0.0  0.8  0.6  0  94 
BOU-DD26-1073 76.0  77.0  0.45  13  1.0  0.0  0.1  0.0  2  56 
BOU-DD26-1073 159.0  160.0  0.85  11  1.0  0.0  0.1  0.4  3  98 
BOU-DD26-1073 276.1  277.1  0.79  11  1.0  0.0  0.6  1.2  4  118 
BOU-DD26-1074 37.7  39.1  0.77  15  1.4  0.0  0.1  0.6  11  100 
BOU-DD26-1074 52.0  59.3  0.64  28  7.3  0.0  1.8  2.7  21  176 
Including 55.8  57.9  1.18  26  2.1  0.0  1.4  3.4  34  230 
BOU-DD26-1074 61.0  62.0  0.50  22  1.0  0.0  0.8  2.7  26  141 
BOU-DD26-1074 75.5  76.1  0.78  16  0.6  0.0  1.2  1.9  20  148 
BOU-DD26-1074 89.8  91.0  4.00  38  1.2  0.1  1.1  2.3  59  472 
BOU-DD26-1075 286.9  287.8  0.87  0  0.9  0.0  0.0  0.1  0  80 
BOU-DD26-1076 140.0  141.0  0.03  62  1.0  0.0  2.6  1.6  25  147 
BOU-DD26-1076 144.2  145.0  0.59  18  0.8  0.1  0.8  3.6  20  168 
BOU-DD26-1076 146.5  158.4  1.56  28  11.9  0.1  1.3  3.3  15  269 
Including 147.1  149.7  3.94  65  2.6  0.4  2.7  6.6  19  635 
BOU-DD26-1077 39.1  41.5  1.40  44  2.4  0.1  0.4  0.5  8  192 
BOU-DD26-1077 43.4  44.0  0.24  74  0.6  0.1  2.6  7.8  12  310 
BOU-DD26-1077 50.0  51.0  0.81  32  1.0  0.0  0.5  0.6  60  129 
BOU-DD26-1077 54.9  59.1  1.10  26  4.2  0.0  0.3  0.7  44  145 
BOU-DD26-1077 61.0  62.0  0.45  13  1.0  0.0  0.1  0.4  48  65 
BOU-DD26-1078 154.9  164.0  1.96  31  9.1  0.1  1.5  4.5  33  331 
BOU-DD26-1078 166.0  167.0  0.67  9  1.0  0.0  0.7  0.0  16  83 
BOU-DD26-1078 168.0  169.0  0.60  8  1.0  0.0  0.3  0.0  9  69 
BOU-DD26-1078 170.0  172.0  0.62  11  2.0  0.0  0.6  0.2  11  83 
BOU-DD26-1078 174.2  177.2  1.85  22  3.0  0.1  0.2  1.4  10  225 
BOU-DD26-1079 42.5  43.4  0.46  16  0.9  0.0  0.4  0.8  5  82 
BOU-DD26-1079 46.1  47.9  0.31  57  1.8  0.0  0.3  0.2  31  98 
BOU-DD26-1079 114.0  115.4  0.37  23  1.4  0.0  1.3  1.0  13  101 
BOU-DD26-1079 141.2  142.1  0.41  38  0.9  0.1  0.1  0.5  10  94 
BOU-DD26-1080 252.6  258.1  0.77  13  5.5  0.0  0.4  0.5  6  103 
Including 252.6  254.2  1.20  12  1.6  0.1  0.1  1.0  8  147 
  1. True width remains undetermined at this stage; all values are uncut.
  2. Ag equivalent is based on a silver price of US$30/oz with a process recovery of 96%, a gold price of US$2,800/oz with a process recovery of 96%, a zinc price of US$1.20/lb with a process recovery of 75%, a lead price of US$1.00/lb with a process recovery of 82%, and a copper price of US$4.60/lb with a process recovery of 75% resulting in the following ratios: 1g/t Au: 89.7g/t Ag; 1% Cu: 78.6 g/t Ag; 1% Pb: 18.7 g/t Ag; and 1% Zn: 20.4 g/t Ag.

Appendix 2 – New Drillhole Coordinates of 2026 Boumadine Exploration Program (completed holes)

Hole No.EastingNorthingElevationAzimuthDipLength (m)
BOU-DD26-1131 316580  3477493  1219  248  -50 174 
BOU-DD26-1132 317131  3476252  1216  250  -50 418 
BOU-DD26-1133 315776  3477353  1287  271  -49 453 
BOU-DD26-1134 315818  3477362  1285  270  -50 405 
BOU-DD26-1135 315348  3477264  1270  270  -50 148 
BOU-DD26-1136 315315  3477262  1277  270  -50 105 
BOU-DD26-1137 316620  3477507  1217  250  -50 201 
BOU-DD26-1138 315750  3476900  1267  270  -50 449 
BOU-DD26-1139 315387  3477263  1267  270  -50 180 
BOU-DD26-1140 316071  3476904  1248  270  -50 401 
BOU-DD26-1141 316655  3477522  1207  247  -49 267 
BOU-DD26-1142 316695  3477538  1209  250  -50 306 
BOU-DD26-1143 315488  3477261  1218  270  -50 306 
BOU-DD26-1144 315485  3477259  1271  270  -50 297 
BOU-DD26-1145 315538  3477261  1290  270  -50 327 
BOU-DD26-1146 316735  3477551  1209  248  -50 345 
BOU-DD26-1147 316775  3477565  1208  250  -50 351 
BOU-DD26-1148 315582  3477258  1292  269  -50 420 
BOU-DD26-1149 315622  3477258  1285  269  -50 201 
BOU-DD26-1150 315659  3477263  1280  270  -50 267 
BOU-DD26-1151 316820  3477581  1214  250  -50 426 
BOU-DD26-1152 315697  3477257  1275  270  -50 250 
BOU-DD26-1153 315743  3477259  1278  270  -50 300 
BOU-DD26-1154 316862  3477596  1213  248  -51 459 
BOU-DD26-1155 315793  3477263  1290  270  -50 351 
BOU-DD26-1156 315375  3477161  1267  270  -50 153 
BOU-DD26-1157 315418  3477163  1264  270  -50 153 
BOU-DD26-1158 316558  3477438  1217  249  -50 114 
BOU-DD26-1159 316899  3477610  1206  250  -50 510 
BOU-DD26-1160 316391  3476900  1232  270  -52 404 
BOU-DD26-1161 317492  3476414  1208  250  -50 350 
BOU-DD26-1162 315527  3477157  1288  270  -50 321 
BOU-DD26-1163 316713  3476896  1231  270  -49 401 
BOU-DD26-1164 316628  3477455  1214  249  -50 204 
BOU-DD26-1165 315377  3477054  1265  270  -50 126 
BOU-DD26-1166 315569  3477158  1287  269  -50 351 
BOU-DD26-1167 315410  3477055  1255  270  -50 154 
BOU-DD26-1168 316699  3477483  1207  249  -51 324 
BOU-DD26-1169 315476  3477055  1279  270  -50 207 
BOU-DD26-1170 315523  3477054  1287  270  -50 261 
BOU-DD26-1171 315412  3476953  1255  270  -50 150 
BOU-DD26-1172 316778  3477508  1209  250  -50 330 
BOU-DD26-1173 315563  3477054  1284  270  -50 303 
BOU-DD26-1174 316864  3477545  1216  249  -50 435 
BOU-DD26-1176 315597  3477053  1275  270  -50 357 
BOU-DD26-1177 315459  3476953  1264  270  -50 207 
BOU-DD26-1178 317580  3476448  1201  250  -50 452 
BOU-DD26-1179 315512  3476953  1275  270  -50 228 
BOU-DD26-1180 316590  3477392  1216  249  -51 231 
BOU-DD26-1181 315553  3476956  1272  270  -50 258 
BOU-DD26-1182 316635  3477404  1220  250  -50 258 
BOU-DD26-1183 315424  3476860  1259  270  -50 108 
BOU-DD26-1184 316674  3477423  1220  250  -50 318 
BOU-DD26-1185 317434  3476436  1210  250  -50 254 
BOU-DD26-1186 315601  3476956  1275  270  -50 306 
BOU-DD26-1187 315466  3476859  1260  270  -50 156 
BOU-DD26-1188 316712  3477433  1216  250  -50 354 
BOU-DD26-1189 316746  3477448  1208  249  -50 405 
BOU-DD26-1190 315511  3476864  1258  270  -50 204 
BOU-DD26-1191 317506  3476465  1206  250  -51 303 
BOU-DD26-1192 315561  3476862  1266  270  -50 252 
BOU-DD26-1193 316792  3477465  1211  250  -50 453 
BOU-DD26-1194 315604  3476861  1269  269  -50 306 
BOU-DD26-1195 316794  3477411  1218  249  -50 414 
BOU-DD26-1196 315407  3476759  1251  270  -50 105 
BOU-DD26-1197 317398  3476485  1208  250  -50 251 
BOU-DD26-1199 315443  3476757  1241  270  -50 105 
BOU-DD26-1200 315485  3476759  1241  270  -50 159 
BOU-DD26-1201 317440  3476502  1207  250  -50 275 
BOU-DD26-1203 317526  3476533  1207  250  -50 380 
BOU-DD26-1204 316917  3477459  1219  250  -50 465 
BOU-DD26-1205 317108  3476832  1213  250  -50 255 
BOU-DD26-1207 317160  3476849  1214  250  -50 327 
BOU-DD26-1208 316950  3477468  1211  249  -49 501 
BOU-DD26-1210 317069  3476872  1218  250  -50 252 
BOU-DD26-1214 317167  3476961  1209  250  -50 375 
BOU-DD26-1215 317551  3476599  1208  250  -50 380 
BOU-DD26-1217 315460  3476808  1244  270  -50 111 
BOU-DD26-1220 317250  3476991  1206  250  -50 480 
BOU-DD26-1222 315425  3476901  1264  270  -50 111 
BOU-RC26-070 317533  3477699  1193  270  -50 95 
BOU-RC26-071 317625  3477697  1201  270  -50 10 
BOU-RC26-072 317627  3477701  1201  270  -50 150 
BOU-RC26-073 317716  3477700  1205  270  -50 150 
BOU-RC26-074 317863  3477696  1189  270  -50 150 
BOU-RC26-075 317954  3477693  1187  270  -50 150 


Photos accompanying this announcement are available at

https://www.globenewswire.com/NewsRoom/AttachmentNg/aca39656-9abb-48ff-ab72-0aae2c38f125
https://www.globenewswire.com/NewsRoom/AttachmentNg/00ddcf38-fe00-4a6a-9cc8-75f8a07c223b
https://www.globenewswire.com/NewsRoom/AttachmentNg/e2e506ce-b308-4032-b7a5-30145c1fc560
https://www.globenewswire.com/NewsRoom/AttachmentNg/df0bc63e-713d-4df5-baa1-4d8c27f70d08 


GlobeNewswire