Figure 1

Figure 1

Kraken Main Zone 2026 drill hole locations, with cross-section showing the full drill trace of VKS25-057, highlighting the reported 24.45-metre mineralized interval and the underlying sulphide-rich interval with assays pending. Drill holes from this release are in orange. Reported intervals represent downhole lengths; true thicknesses are not yet known. Intercept lengths and grades have been rounded to one decimal place.

Format

PNG

Quelle:

Viridian Metals Inc.

Downloads