Figure 2

Figure 2

Long Section of the central vein in the 10-20 area at Cedar Bay showing the down hole lengths and grades of historic and 2018 drilling in an area adjacent to the existing mine shaft.

Format

PNG

Quelle:

DORÉ COPPER MINING CORP

Downloads