Exhibit 2

Exhibit 2

Key intercepts in this release, figure shows the significant thickness and grade of intercepts in a conceptual Phase 1 open pit. These shallower starter pits can have the effect of improving the economics of the project by inherently lower stripping ratios and quicker payback periods.

Format

PNG

Quelle:

Globex Mining Enterprises Inc.

Downloads