Figure 3

Figure 3

October 6, 2026: view north from near planned drill site J5 on the New Boston project in Nevada, a 300 m step-out from NB26-003 located to the west of this photo, behind the truck and down the Jeep Mine ridgeline, with the 2,892 ft intersection of continuous, polyphase stockwork veining with moly, copper, tungsten and silver mineralization. Note HWY 95 infrastructure in the background in the Soda Springs valley, a tremendous advantage for cost-effective exploration at New Boston.

Format

PNG

Quelle:

VR Resources Ltd.

Downloads