Figure 1

Figure 1

Nickel extraction over time for Pipestone XL awaruite compared with two high-magnesium nickel sulfide feedstocks from the Tamarack project (left), and the cerium refining process (right): cerium leaches the nickel, and the spent cerium is regenerated electrochemically and reused. Source: graphical abstract, Donovan et al. (2026), ACS Sustainable Resource Management.

Format

PNG

Quelle:

First Atlantic Nickel & Cobalt Corp.

Downloads