Figure 1
Eloro Resources Intersects 198.00 g Ag eq/t (67.79 g Ag/t, 1.44% Zn and 1.04% Pb) over 134.47m in Silver-Rich Area of High-Grade Feeder Zone in Santa Barbara Target Area at the Iska Iska Silver-Tin Polymetallic Project, Potosi Department, Bolivia
October 05, 2022 06:00 ET | Eloro Resources Ltd.
This intersection in hole DSB-31, drilled 200m southeast of the Santa Barbara adit, includes a higher-grade portion grading 566.36 g Ag eq/t (246.26 g Ag/t, 3.72% Zn and 3.88% Pb) over...
Eloro Resources Inc..png
Eloro Resources Announces Annual Meeting Voting Results
September 28, 2022 11:23 ET | Eloro Resources Ltd.
TORONTO, Sept. 28, 2022 (GLOBE NEWSWIRE) -- Eloro Resources Ltd. (TSX-V: ELO; OTCQX: ELRRF; FSE: P2QM) (“Eloro”, or the “Company”) is pleased to announce that in connection with the annual and...
Eloro Resources Inc..png
Eloro Resources Amends Payment Schedule for Iska Iska Silver-Tin Polymetallic Project, Potosi Department, Bolivia
September 27, 2022 07:00 ET | Eloro Resources Ltd.
TORONTO, Sept. 27, 2022 (GLOBE NEWSWIRE) -- Eloro Resources Ltd. (TSX-V: ELO; OTCQX: ELRRF; FSE: P2QM) (“Eloro”, or the “Company”) is pleased to announce that, by mutual agreement with Empresa...
Figure 1
Eloro Resources Intersects 150.47 g Ag eq/t (9.45 g Ag/t, 1.53% Zn, 0.88% Pb and 0.07% Sn) over 441.21m in High-Grade Feeder Zone in Santa Barbara Target Area at the Iska Iska Silver-Tin Polymetallic Project, Potosi Department, Bolivia
September 20, 2022 06:00 ET | Eloro Resources Ltd.
This intersection in hole DSB-30 includes a higher-grade portion grading 209.30 g Ag eq/t (10.06 g Ag/t, 2.76% Zn, 0.98% Pb and 0.07% Sn) over 102.30m. This hole has the longest continuously...
Eloro Resources Inc..png
Eloro Resources’ Announces Launch of its Virtual Site Tour of the Iska Iska Silver-Tin Polymetallic Project in southern Bolivia on the VRIFY Technology Inc. (VRIFY) Platform
August 09, 2022 07:00 ET | Eloro Resources Ltd.
TORONTO, Aug. 09, 2022 (GLOBE NEWSWIRE) -- Eloro Resources Ltd. (TSX-V: ELO; OTCQX: ELRRF; FSE: P2QM) (“Eloro”, or the “Company”) is pleased to announce the launch of its Virtual Site Tour utilizing...
Table 1
Eloro Resources’ Deep Underground Hole DSBU-10 Intersects 188.64 g Ag eq/t (44.75 g Ag/t, 0.08 g Au/t, 1.05% Zn, 0.76% Pb and 0.14% Sn) over 349.08m in Core of Feeder Zone in the Santa Barbara Target Area at the Iska Iska Silver-Tin Polymetallic Project, Potosi Department, Bolivia
July 21, 2022 06:00 ET | Eloro Resources Ltd.
Hole DSBU-10 drilled at azimuth 400 and a dip of -600, is the highest grade, longest intersection thus far at Iska Iska and includes the highest grade Ag to date of 44.75 g Ag/t over 349.08m. Notably,...
Eloro Resources Inc..png
Eloro Resources Provides Update on the Preliminary Metallurgical Testwork Program for the Iska Iska Silver-Tin Polymetallic Project, Potosi Department, Bolivia
June 13, 2022 06:00 ET | Eloro Resources Ltd.
TORONTO, June 13, 2022 (GLOBE NEWSWIRE) -- Eloro Resources Ltd. (TSX-V: ELO; OTCQX: ELRRF; FSE: P2QM) (“Eloro”, or the “Company”) is pleased to provide an update on its preliminary metallurgical...
Eloro Logo.jpg
Peter Marrone Appointed to the Position of Senior Corporate Advisor to Eloro Resources Ltd.
June 06, 2022 07:00 ET | Eloro Resources Ltd.
TORONTO, June 06, 2022 (GLOBE NEWSWIRE) -- Eloro Resources Ltd. (TSX-V: ELO; OTCQX: ELRRF; FSE: P2QM) (“Eloro” or the “Corporation”) is pleased to announce that Mr. Peter Marrone, a shareholder of...
Figure 1
Eloro Resources Intersects 160.00 g Ag eq/t (27.37g Ag/t, 0.62% Zn, 0.52% Pb and 0.11% Sn) over 251.87m and 133.45 g Ag eq/t (19.10g Ag/t, 0.20 g Au/t, 0.42% Zn, 0.64% Pb and 0.08% Sn) over 289.45m in the Santa Barbara Target area at the Iska Iska Silver-Tin Polymetallic Project, Potosi Department, Bolivia
May 25, 2022 06:00 ET | Eloro Resources Ltd.
These new drill results combined with previously released drill results for the underground drilling are defining a potential major feeder structure for the Ag-Sn polymetallic mineralization in the...