Eloro Resources Intersects 198.00 g Ag eq/t (67.79 g Ag/t, 1.44% Zn and 1.04% Pb) over 134.47m in Silver-Rich Area of High-Grade Feeder Zone in Santa Barbara Target Area at the Iska Iska Silver-Tin Polymetallic Project, Potosi Department, Bolivia
October 05, 2022 06:00 ET
|
Eloro Resources Ltd.
This intersection in hole DSB-31, drilled 200m southeast of the Santa Barbara adit, includes a higher-grade portion grading 566.36 g Ag eq/t (246.26 g Ag/t, 3.72% Zn and 3.88% Pb) over...
Eloro Resources Announces Annual Meeting Voting Results
September 28, 2022 11:23 ET
|
Eloro Resources Ltd.
TORONTO, Sept. 28, 2022 (GLOBE NEWSWIRE) -- Eloro Resources Ltd. (TSX-V: ELO; OTCQX: ELRRF; FSE: P2QM) (“Eloro”, or the “Company”) is pleased to announce that in connection with the annual and...
Eloro Resources Amends Payment Schedule for Iska Iska Silver-Tin Polymetallic Project, Potosi Department, Bolivia
September 27, 2022 07:00 ET
|
Eloro Resources Ltd.
TORONTO, Sept. 27, 2022 (GLOBE NEWSWIRE) -- Eloro Resources Ltd. (TSX-V: ELO; OTCQX: ELRRF; FSE: P2QM) (“Eloro”, or the “Company”) is pleased to announce that, by mutual agreement with Empresa...
Eloro Resources Intersects 150.47 g Ag eq/t (9.45 g Ag/t, 1.53% Zn, 0.88% Pb and 0.07% Sn) over 441.21m in High-Grade Feeder Zone in Santa Barbara Target Area at the Iska Iska Silver-Tin Polymetallic Project, Potosi Department, Bolivia
September 20, 2022 06:00 ET
|
Eloro Resources Ltd.
This intersection in hole DSB-30 includes a higher-grade portion grading 209.30 g Ag eq/t (10.06 g Ag/t, 2.76% Zn, 0.98% Pb and 0.07% Sn) over 102.30m. This hole has the longest continuously...
Eloro Resources’ Announces Launch of its Virtual Site Tour of the Iska Iska Silver-Tin Polymetallic Project in southern Bolivia on the VRIFY Technology Inc. (VRIFY) Platform
August 09, 2022 07:00 ET
|
Eloro Resources Ltd.
TORONTO, Aug. 09, 2022 (GLOBE NEWSWIRE) -- Eloro Resources Ltd. (TSX-V: ELO; OTCQX: ELRRF; FSE: P2QM) (“Eloro”, or the “Company”) is pleased to announce the launch of its Virtual Site Tour utilizing...
Eloro Resources’ Deep Underground Hole DSBU-10 Intersects 188.64 g Ag eq/t (44.75 g Ag/t, 0.08 g Au/t, 1.05% Zn, 0.76% Pb and 0.14% Sn) over 349.08m in Core of Feeder Zone in the Santa Barbara Target Area at the Iska Iska Silver-Tin Polymetallic Project, Potosi Department, Bolivia
July 21, 2022 06:00 ET
|
Eloro Resources Ltd.
Hole DSBU-10 drilled at azimuth 400 and a dip of -600, is the highest grade, longest intersection thus far at Iska Iska and includes the highest grade Ag to date of 44.75 g Ag/t over 349.08m. Notably,...
Eloro Resources’ Deep Hole DSBS-02 Encounters Numerous Mineralized Intercepts Including 146.65 g Ag eq/t (10.74 g Ag/t, 1.01 g Au/t, 0.31% Zn, 0.11% Pb and 0.06% Sn) over 88.66m and 131.86 g Ag eq/t (21.38 g Ag/t, 0.06 g Au/t, 0.25% Zn, 0.24% Pb and 0.14% Sn) over 104.38m in the Santa Barbara Target Area at the Iska Iska Silver-Tin Polymetallic Project, Potosi Department, Bolivia
June 14, 2022 06:00 ET
|
Eloro Resources Ltd.
Hole DSBS-02 was drilled across the interpreted Santa Barbara feeder zone to a length of 1,023.4m, corresponding to a vertical depth of 745m. Notably, 67% of the overall length of this hole yielded...
Eloro Resources Provides Update on the Preliminary Metallurgical Testwork Program for the Iska Iska Silver-Tin Polymetallic Project, Potosi Department, Bolivia
June 13, 2022 06:00 ET
|
Eloro Resources Ltd.
TORONTO, June 13, 2022 (GLOBE NEWSWIRE) -- Eloro Resources Ltd. (TSX-V: ELO; OTCQX: ELRRF; FSE: P2QM) (“Eloro”, or the “Company”) is pleased to provide an update on its preliminary metallurgical...
Peter Marrone Appointed to the Position of Senior Corporate Advisor to Eloro Resources Ltd.
June 06, 2022 07:00 ET
|
Eloro Resources Ltd.
TORONTO, June 06, 2022 (GLOBE NEWSWIRE) -- Eloro Resources Ltd. (TSX-V: ELO; OTCQX: ELRRF; FSE: P2QM) (“Eloro” or the “Corporation”) is pleased to announce that Mr. Peter Marrone, a shareholder of...
Eloro Resources Intersects 160.00 g Ag eq/t (27.37g Ag/t, 0.62% Zn, 0.52% Pb and 0.11% Sn) over 251.87m and 133.45 g Ag eq/t (19.10g Ag/t, 0.20 g Au/t, 0.42% Zn, 0.64% Pb and 0.08% Sn) over 289.45m in the Santa Barbara Target area at the Iska Iska Silver-Tin Polymetallic Project, Potosi Department, Bolivia
May 25, 2022 06:00 ET
|
Eloro Resources Ltd.
These new drill results combined with previously released drill results for the underground drilling are defining a potential major feeder structure for the Ag-Sn polymetallic mineralization in the...