Accessibility: Skip TopNav
Figure 8
Cross section at the Ethan Breccia. Hole SFDH-63 was drilled parallel to hole SFRC-061, which was lost at 69m and had intersected 31m @ 0.66% of CuEq. The Company is currently modelling the distribution of grade in this large breccia body.
Format
PNG
Source
Turmalina Metals Corp.
Téléchargements
Original
Grand
Moyen
Petit