Figure 4

Figure 4

Schematic Cross Sections showing the cut-off grade reporting boundaries at White Hill. The 2023 December estimate was reported using a simplistic RL depth for open pit potential based on work conducted during the 2021 Scoping Study. The 2024 resource is being reported using optimised pit shapes generated during the ongoing PFS.

Format

JPEG

Source

Xanadu Mines Ltd.

Téléchargements